Crews reach key step in Hwy. 520 bridge replacement

«Previous
2 of 14 Photos
Next »
Read the story
120329_520_bridge_600-2
«
  • 120329_520_bridge_600-1
  • 120329_520_bridge_600-2
  • 120329_520_bridge_600-3
  • 120329_520_bridge_600-4
  • 120329_520_bridge_600-5
  • 120329_520_bridge_600-6
  • 120329_520_bridge_600-7
»
120329_520_bridge_600-2
View from of the new SR 520 floating bridge from an artist's rendering of the Evergreen Point Road lid. Note: The Evergreen Point Road lid is being designed as part of the SR 520 Eastside project and this illustration does not reflect final design. (Artist's renderinh by DOT)