Crews reach key step in Hwy. 520 bridge replacement

«Previous
11 of 14 Photos
Next »
Read the story
120329_520_bridge_600-11
«
  • 120329_520_bridge_600-8
  • 120329_520_bridge_600-9
  • 120329_520_bridge_600-10
  • 120329_520_bridge_600-11
  • 120329_520_bridge_600-12
  • 120329_520_bridge_600-13
  • 120329_520_bridge_600-14
»
120329_520_bridge_600-11
There will be five belvederes along the bicycle/pedestrian path. Three located on the floating bridge and one at each sentinel. Belvederes will include benches and interpretive signage to enhance the cyclist and pedestrian experience as they cross the longest floating bridge in the world. (Artist's rendering by WSDOT)