Crews reach key step in Hwy. 520 bridge replacement

«Previous
8 of 14 Photos
Next »
Read the story
120329_520_bridge_600-8
«
  • 120329_520_bridge_600-5
  • 120329_520_bridge_600-6
  • 120329_520_bridge_600-7
  • 120329_520_bridge_600-8
  • 120329_520_bridge_600-9
  • 120329_520_bridge_600-10
  • 120329_520_bridge_600-11
»
120329_520_bridge_600-8
A rendering of pedestrians on the planned bicycle/pedestrian path of the new SR 520 floating bridge, shown at night with the sentinel illuminated. (Artist's rendering by WSDOT)