Investigation uncovers claims of costly cover-up on 520 project

«Previous
1 of 5 Photos
Next »
Read the story
121025_Pontoon3
«
  • 121025_Pontoon3
  • Poor patching of the wall allows water to leak in
  • 121025_Pontoon3
  • A damp wall is seen inside the pontoon
  • Water sits inside another pontoon
»
121025_Pontoon3
A KOMO 4 Problem Solver investigation has uncovered evidence of widespread leaks and cracks in pontoons destined for the new $4.6 billion 520 bridge.